|
Estimated Project Cost: $300,000-$500,000 Contract Working Days: 75
This project consists of work at two separate work sites that will include installing approximately 1700 linear feet of 8 inch and 10 inch C900 PVC watermain, water main valves, tapping sleeves, roadway subgrade excavation, HMA patching, connecting to existing water mains, reconnecting existing water services, and traffic control.
|
|
4/22/2022 8:00 AM
|
|
Columbia Basin Herald: April 22, 2022
|
|
Open Until Contracted
|
|
Bid Opening June 2, 2022, at 2:00 PM
|
|
321 S Balsam St, Moses Lake WA
|
|
Mark Beaulieu, P.E.; 509.764.3776; mbeaulieu@cityofml.com
|
|
$50.00 for paper copy
|
|
Plans and specifications shall be obtained via the Civic Center Annex at 321 S Balsam St, Moses Lake WA 98837
|
|
8:00 a.m. to 4:00 p.m.
|
|
Attached as a related document, call to request, (509)764-3786, or email request to tkehret@cityofml.com
|
|
All bids shall be received before said opening time in sealed envelopes with MILWAUKEE AND AEROTEC WATER MAINS marked plainly thereon. All bids shall be accompanied by a deposit in the form of a postal money order, cashier's check, or bond in an amount equal to 5 percent of the maximum total of the bid. Only bids from bidders who have received plans and specifications VIA the Civic Center Annex will be accepted. Copies of plans and specifications are on file for review at the cityofml.com Engineering projects website.
|
|
|
|